教授
博士生导师
硕士生导师
上一条: Wang XP, Tang LX*. Scheduling a single machine with multiple job processing ability to minimize makespan, Journal of the Operational Research Society, 62 (8): 1555-1565, 2011. (JCR 2区)
下一条: Tang LX*, Wang XP. An improved particle swarm optimization algorithm for the hybrid flowshop scheduling to minimize total weighted completion time in process industry, IEEE Transactions on Control Systems Technology, 18(6): 1303-1314, 2010. (中科院SCI 2区)