Professor
Supervisor of Doctorate Candidates
Supervisor of Master's Candidates
Hits:
Indexed by:Journal paper
First Author:Jinwen Wang
Correspondence Author:Jinwen Wang
Journal:Energy Conversion and Management
Included Journals:EI、SCI
Affiliation of Author(s):Huazhong University of Science and Technology
Discipline:Engineering
First-Level Discipline:Hydraulic Engineering
Document Type:J
Volume:50
Page Number:1085–1094
Date of Publication:2009-01-10
Abstract:The Fujian hydropower system (FHS) is one of the provincial hydropower systems with the most complicated hydraulic topology in China. This paper describes an optimization program that is required by Fujian Electric Power Company Ltd. (FEPCL) to aid the shift engineers in making decisions with the shortterm hydropower scheduling such that the generation benefit can be maximal. The problem involves 27 reservoirs and is formulated as a nonlinear and discrete programming. It is a very challenging task to solve such a large-scale problem. In this paper, the Lagrangian multipliers are introduced to