Shen Hongyan1*,Yan Yueying1,Duan Ruifeng2,Liu Jian3,Li Meng1,Yang Feilong1
(1 School of Earth Sciences and Engineering,Xian Shiyou University,Xian 710065,Shaanxi,China;2 Shaanxi Geomining Geophysical and Geochemical Exploration Team Co.Ltd.,Xian 710043,Shaanxi,China;3 Shanxi Geophysical and Geochemical Prospecting Institute Co.Ltd.,Yuncheng 044004,Shanxi,China)
Abstract:
The performance test of geophone is an important and basic test before seismic data acquisition.In order to further improve the practice and training contents of Principles of Seismic Exploration,Engineering Geophysical Prospecting and related courses in our school,and constantly improve the quality of the training of geological professionals,the geophone detection experiment project was developed,and two geophone detection experiment schemes of circular (arc) observation system and linear observation system were designed.Through the implementation of the experimental project,it is expected to enable students to master the principles and technologies of seismic data acquisition methods,and further consolidate the professional skills and literacy of geophysical exploration of geological students.
KeyWords:
seismic exploration; data acquisition; geophone; observation system; detection experiment