徐建有
-
博士生导师
硕士生导师
- 教师拼音名称:Xu Jianyou
- 学历:博士研究生毕业
- 主要任职:信息科学与工程学院 - 教授
- 其他任职:辽宁省城市智能交通与物流工程技术研究中心 - 副主任
- 毕业院校:东北大学
- 学科:控制理论与控制工程
模式识别与智能系统
系统工程
- 2023-06曾获荣誉当选:东北大学优秀共产党员
- 2021-06曾获荣誉当选:东北大学直属部门党委优秀共产党员
- 2021-05曾获荣誉当选:东北大学基金工作先进个人
- 2020-05曾获荣誉当选:东北大学招生宣传先进个人
- 2020-01曾获荣誉当选:沈阳市反恐工作先进个人
访问量:
-
Win-Chin Lin,Jianyou Xu, Danyu Bai, I-Hong Chung, Shang-Chia Liu.Artificial bee colony algorithms for the order scheduling with release dates.Soft Computing,23,(18):2019,[SCI检索].[JCR 一区].
-
Jianyou Xu,Shang-Chia Liu*, Chuanli Zhao, Junjie Wu,Win-Chin Lin,Pay-Wen Yu.An iterated local search and tabu search for two-parallel machine scheduling problem to minimize the maximum total completion time.Journal of Information and Optimization Sciences,40,(3):2019,[EI检索].
-
Jan-Yee Kung,Jiahui Duan,Jianyou Xu,I-Hong Chung,Shuenn-Ren Cheng,Win-Chin Lin.Metaheuristics for Order Scheduling Problem with Unequal Ready Times.Discrete Dynamics in Nature and Society,2018,[SCI检索].[JCR 三区].
-
Jianyou Xu,Yunqiang Yin, Yu Cheng,Chin-Chia Wu.A two-machine flowshop scheduling problem with a job precedence constraint to minimize the total completion time.Journal of Scientific & Industrial Research (JSIR),76,(12):2018,[SCI检索].[JCR 三区].
-
Jianyou Xu,Chin-Chia Wu, Yunqiang Yin,Win-Chin Lin.An Iterated Local Search for the Multi-objective Permutation Flowshop Scheduling Problem wtih Sequence-dependent Setup Times.Applied Soft Computing,52,(3):2017,[SCI检索].[JCR 一区].
-
Jianyou Xu,Win-Chin Lin, Junjie Wu, Shuenn-Ren Cheng,Zi-Ling Wang.Heuristic based genetic algorithms for the re-entrant total completion time flowshop scheduling with learning consideration.International Journal of Computational Intelligence Systems,9,(6):2016,[SCI检索].
-
Jianyou Xu,Chin-Chia Wu, Yunqiang Yin,
Chuanli Zhao, Yi-Tang Chiou,Win-Chin Lin.An order scheduling problem with position-based learning effect.Computers & Operations Research,74,(10):2016,[SCI检索].
-
Yunqiang Yin,Jianyou Xu, T.C.E. Cheng.Approximation schemes for single-machine scheduling with a fixed maintenance activity to minimize the total late work.Naval Research Logistics,63,(2):2016,[SCI检索].[JCR 三区].
-
Du-Jun Wang,Yunqiang Yin, Jianyou Xu, Wen-Hsiang Wu,Chin-Chia Wu.Some due date determination scheduling problems with two agents on a single machine.International Journal of Production Economics,168,(10):2015,[SCI检索].[JCR 一区].
-
Jianyou Xu,Yunqiang Yin, T.C.E. Cheng, Chin-Chia Wu, Shusheng Gu.A memetic algorithm for the re-entrant permutation flowshop scheduling problem to minimize the makespan.Applied Soft Computing,24,2014,[SCI检索].