Scientific Research
No content
-
[1] Li Rongbo, Jiang Zhiqiang*, Ji Changming, Li Anqiang, Yu Shan. An improved risk-benefit collaborative grey target decision model and its application in the decision making of load adjustment schemes[J]. Energy, 2018, 156: 387-400. (SCI, IF= 4.552)
-
[2] Rongbo Li, Zhiqiang Jiang*, Anqiang Li, Shan Yu, Changming Ji. An improved shuffled frog leaping algorithm and its application in the optimization of cascade reservoir operation[J]. Hydrological Sciences Journal, 2018, 63:15-16, 2020-2034, DOI: 10.1080/02626667.2018.1558814.
-
[3] Zhiqiang Jiang*, Yaqi Qiao, Yuyun Chen, Changming Ji. A new reservoir operation chart drawing method based on dynamic programming[J]. Energies, 2018, 11(12).
-
[4] Zhiqiang Jiang*, Rongbo Li, Changming Ji, Anqiang Li, Jianzhong Zhou. Wavelet analysis based projection pursuit auto regression model and its application in the runoff forecasting of Li Xiangjiang basin[J]. Hydrological Sciences Journal, 2018, 63(12):1817-1830. (SCI, IF= 2.274)
-
[5] Zhiqiang Jiang*, Li Rongbo, Li Anqiang, Ji Changming. Runoff forecast uncertainty considered load adjustment model of cascade hydropower stations and its application[J]. Energy, 2018, 158:693-708. (SCI, IF= 4.552)
No content
-
[1] 梯级水电站近边界运行全景模糊风险分析及多属性方案决策,国家自然科学基金(青年项目),27万,2019.01-2021.12,项目负责人。
-
[2] 国家重点研发计划项目“珠江流域水资源多目标调度技术与应用” (2017YFC0405900)之课题五“流域水资源多目标智能化协同调度”之专题5.3“流域水量水质耦合精细化配置模型”,2017.7-2020.12,专题负责人。
-
[3] 长江水利委员会长江科学院开放研究基金资助项目"基于预报误差模糊性和可信性理论的梯级水库群汛限水位模糊风险控制",CKWV2016371/KY,2016.7-2018.6, 项目负责人。
-
[4] 华中科技大学自主创新研究基金资助项目“水电站短期发电调度近边界运行的模糊风险分析”,2017KFYXJJ198,2017.1~2019.12,项目负责人。
-
[5] 中央高校基本科研业务专项资金项目“梯级水电站水库群短期调度水流滞时问题研究”,13XS23,2013.1-2014.12,项目负责人。